Manufacturing & Quality Control
A probe is a precision acoustic device — you can only repair as well as you can manufacture. With our own Class 100,000 cleanroom line, all eight core processes are completed in-house,
with every probe and every element tested and compared against OEM baselines. Manufacturing capability and quality data together define MYPRO’s delivery bottom line.
Class 100,000
cleanroom
8
core processes in-house
±2dB
per-element acceptance limit
One file per unit
data traceable end to end
Dual ISO
9001 · 13485 in progress
30+ yrs
team industry experience
From Baseline to Documentation: the Data Chain Behind Every Product
Baseline → Design → Manufacturing → In-process inspection → Verification → Documentation. Six steps, and every unit leaves a verifiable data trail.
Establish Baseline
Measured acoustic and geometric parameters of OEM units serve as the manufacturing baseline — everything starts from data.
Design
In-house acoustic structure design — every parameter of the array, matching layers and backing is computable and traceable.
Manufacturing
Core processes run on our own production line, with process parameters recorded on the work order — no “black-box manufacturing”.
In-Process Inspection
Self-inspection after each process, plus patrols on key steps; parameters recorded on the work order — failures never move to the next step.
Verification
Element-by-element testing with a ±2dB acceptance limit; on-system comparison confirms equivalence; test reports in both dB and cm ship with the probe.
Documentation
Measurement methods are codified into company acceptance standards; one file per unit, with key process parameters and test results traceable end to end.
Core Manufacturing Processes & Inspection
Production line in practice: the first four are core process steps, the last four are inspection steps recorded unit by unit — process parameters and test data go into the same per-unit file.
01 Wafer dicing — piezoelectric wafers are precisely diced into array elements, laying the foundation of the acoustic field.
02 Lens potting — the acoustic lens is potted in one piece to secure sound transmission and focusing.
03 Acoustic stack bonding — matching layer, piezoelectric elements and backing are bonded layer by layer to form the core of the acoustic head.
04 Encapsulation & curing — full encapsulation and curing ensure long-term stability and sealing.
05 Element-by-element scanning — sensitivity and consistency are checked element by element to locate any hidden defect.
06 Acoustic measurement — key acoustic parameters are measured one by one against the design baseline.
07 Phantom testing — imaging performance is verified on a standard phantom, close to real clinical use.
08 Clinical validation — on-system imaging is validated and all data archived for traceability.
All photos are taken on our production line. Visits are welcome by appointment — inspect the equipment and work in progress in person.
Design Verification: In-House Components vs OEM Baseline
Same probe, same station, same conditions — measured data comparison.

AUTO On · MP acoustic head · GE C1-6

AUTO On · OEM acoustic head · GE C1-6

AUTO Off · Same Gain · MP left / GE OEM right · C1-6

AUTO Off · OEM −5dB · MP left / GE OEM right · C1-6

Target Comparison · PHILIPS S5-1

Brightness Comparison · PHILIPS S5-1

Artifact Comparison · PHILIPS S5-1
Two measured comparison sets (same system, same conditions): top row GE C1-6 — AUTO on shows MP and OEM acoustic heads separately, AUTO off shows MP on the left and OEM on the right; bottom row PHILIPS S5-1 — target, brightness and artifact comparisons, all with MP on the left and OEM on the right.
Final Inspection
Covers the items below; per-element acoustic echo test results are compared directly against the baseline, controlling quality consistency with data.
01 Visual inspection
02 Per-element acoustic echo test
03 Electrical safety test
04 On-system imaging verification
05 Air-image paperclip test
06 Cable inspection
07 Traceability record
08 Release sign-off
Every repaired probe ships with a unit-level test report, including:
Probe identity (model · serial number · connector type)→
Reported fault (customer report + photos)→
Pre-repair diagnosis (element map · electrical data · optical photos)→
Repair work performed (detailed process records)→
Post-repair test data (element map · electrical safety · seal integrity · on-system imaging)→
Release approval (testing engineer signature · date)
Contact Mr. Wu for a complete sample test report, or receive one with your probe evaluation.
Compliance
Electrical Safety
Insulation resistance and leakage current tested unit by unit per IEC 60601-1 / IEC 62353 — safety is the compliance bottom line and is checked before every delivery.
Biocompatibility
Patient-contact materials all carry biocompatibility test reports (ISO 10993 series) and withstand standard disinfection protocols; report numbers are filed in the per-unit record, traceable with each delivery.
Element Consistency
A ±2dB acceptance limit, in line with OEM internal controls and published industry standards; statistics cover both standard deviation and maximum deviation to expose outlier dead elements.
The Boundary of Repair & Remanufacturing
Per regulators: replacement parts that are engineering-verified as equivalent to OEM parts in form, fit and function fall within restorative repair; equivalence measurement and mandatory verification each cover different ground — verification answers “can it be used legally”, equivalence measurement answers “how close is it”.
Credentials & Systems
National
High-Tech Enterprise
Dual ISO
certification in progress
Class 100,000
cleanroom
30+ yrs
team industry experience
Sci-Tech SME
registered
Tax credit A
consecutive years
Visit the Line or Discuss Partnership
See the equipment, the processes and the test data — book a day ahead at a time that suits you.